Skip to main content
DRAFT FOR ATTORNEY REVIEW — NOT FINAL

Tolliver v. 5 G Homes, LLC, 563 S.W.3d 827 (2018)

Citation
Tolliver v. 5 G Homes, LLC, 563 S.W.3d 827 (2018)
Parent Document
Tolliver v. 5 G Homes, LLC, 563 S.W.3d 827 (2018)
Jurisdiction
Missouri (state)
Effective Date
2018-11-27

Other Sections in This Document (30)

Full Text

934 chars
In early May, Ms. Tolliver had to move everything out of the bedrooms so a construction crew could begin replacing the carpet. Ms. Tolliver asked Appellant on two occasions to pay for a hotel room during the on-going construction because she and her roommate were suffering from allergies. However, Appellant declined and instead offered to reduce June's rent by half. On May 9, Ms. Tolliver informed Appellant that she and her roommate had decided not to renew their lease, and would vacate the apartment by June 15. Construction continued in the apartment through the month of May. On June 8, the City Inspector gave a follow-up inspection of the apartment. While Appellant had fixed most of the issues, the City Inspector *830noted some surface mold was still growing on the bathroom wall behind the toilet and on the shower floor, and a small section of waterlogged drywall behind the rear foyer doors still needed to be replaced.